Christmas closing

Dear customer, we inform you that Hydroservice will be closed from 20/12/2024 to 06/01/2025. Orders will then be processed starting from 07/01/2025.

The purpose of the Nitrogen Booster is to load the accumulators (individually or in the HPU) with nitrogen at preloading pressure, transferring it from the cylinder to the accumulator; the minimum pressure in the cylinder should be 20 bar.

The pre-loading pressure of nitrogen for the bag and piston accumulators must be checked periodically (about every 3-6 months) and corrected when necessary. Checks and corrections must be carried out without back-pressure on the oil side of the accumulator. It is necessary, therefore, to disable and drain the oil side, by means of the manual cut-off and decompression valve, before checking the accumulators.

After doing the above, a special valve must be connected to the nitrogen control and filling coupling on the head of the accumulator. This special component (the nitrogen control and filling device) is provided by the manufacturer of the accumulator.

The Nitrogen Booster is connected to the electrical system, to the nitrogen cylinder by means of the "in PB" coupling, and with a hose to the accumulator to be filled (by means of the “out ACC” coupling).

The Nitrogen Booster is available in the Ex Model version.

To purchase or find out prices, you need to login/register at the shop

Need a fast help?

Our qualified technical staff is at your service to help you identify the most suitable solution for your needs

Hydroservice stands out on the market for highly specialized and constantly updated technical staff, both in the planning-consulting phase and in the production phase.

Ask the E-Shop support